IMPs Deliver a Front-Row Seat to Salt Lake City’s Skyline

Developers of the Salt Lake City Hyatt Regency needed an external cladding product that could accommodate a fast-paced construction schedule. Insulated Metal Panels (IMPs) allowed rapid construction, requiring only one pass with a single product around the building. The results were a fast build – and an impressive view.

Read the Case Study from MCA Member Nucor Corporation >

Leave a Reply